Skip to content
Cooling tower standing between mining containers at the Southeast Texas site

Hosting location · Southeast Texas, USA

Six megawatts on a dedicated line.

Served by Entergy Texas. Air and hydro cooled machines side by side, watched around the clock, at $0.07 per kWh for machines bought through us, fixed for your contract.

6 MWPower capacity
EntergyRegulated utility
Air + hydroCooling supported
98%Uptime SLA
24/7NOC and cameras
  1. Home
  2. Hosting
  3. Southeast Texas
Scroll

How power reaches your miner

Follow the electrons.

  1. A dedicated primary line

    Power arrives on a dedicated primary line from Entergy Texas, isolated from other operations on site.

  2. On site transformers

    Transformers and distribution equipment step the supply down for the containers.

  3. Air cooled containers

    Racked, wired and configured by our team. Louvered containers move air through the machines.

  4. Hydro capacity

    A cooling tower stands between the containers, so hydro machines like the M73 run on the same site.

  5. Watched around the clock

    The NOC tracks hashrate, thermal events and hardware status 24/7; staff are on site 20 hours a day with 24 hour cameras.

Site schematic Southeast Texas Layout is illustrative 00%

Why the rate does not move

Regulated power. A fixed price.

The site sits outside the ERCOT footprint. It is served by Entergy Texas, a regulated utility on the MISO grid, not a deregulated spot market, so our costs are not exposed to hour to hour price swings.

$0.07 fixed for the contract term Illustration only, not real prices
Your rate with usAn indexed quote that follows the market
01

Regulated utility

Entergy Texas, not a spot market.

02

Fixed for your term

Utility or wholesale price moves do not change your contracted rate.

03

No state income tax

A business friendly environment for digital asset operations.

04

Room to operate

Land and infrastructure that make Texas a leading state for large scale mining.

What a month costs

One miner, worked through.

A 3,500 W machine running continuously. Example only, not a guarantee: real cost follows your miner's actual draw and uptime.

Power3,500 W× Hours24 × 30= Energy2,520 kWh× Rate$0.07= Per month$176.40

The M70 and M70S draw about 3,140 to 5,000 W depending on power mode, and the M73 about 7,200 W at rated load. Estimate your own fleet

In context

Where $0.07 sits.

US hosting rates generally run from $0.06 to $0.09 per kWh, with competitive facilities clustered between $0.065 and $0.08. Check two things on any quote: is it fixed or indexed, and what is excluded.

$0.07 · us
$0.06$0.065$0.07$0.075$0.08$0.085$0.09
Where competitive facilities cluster

Visiting

Tours for larger clients.

Tours are available for clients hosting more than 15 units. Visitors sign a confidentiality agreement not to publicize the site's location, which is why the street address is not published.

Start hosting

Put your machines on this line.

Tell us the model and quantity. We reply within one business day.