
Hosting · Southeast Texas
$0.07per kWh
all in.
Texas bitcoin mining hosting at one flat rate that covers power delivery, demand charges and utility grid fees, fixed for your contract. It applies to miners bought from us, from a single machine; fleets you bring yourself (10 or more) run at $0.08. No performance fees, no tiered billing, and you keep 100% of what you mine.
- Home
- Hosting
One number
Everything in. Nothing added.
The rate is the whole bill for running your machine. Here is what it carries, and what it never will.
- ElectricityPower delivery, demand charges and utility grid fees, at a flat $0.07 per kWh.
- Cooling infrastructureAir cooled and hydro cooled ASICs, each with proper thermal management.
- NOC monitoring24/7 watch on hashrate, thermal events and hardware status.
- On site operationsRacking, wiring, initial configuration and hands on management.
- SecurityOn site staff 20 hours a day, 7 days a week, and 24 hour cameras.
- Performance feesWe take nothing from what your machine mines.
- Revenue share100% of the output goes to your wallet or pool account.
- Tiered billingA single machine pays the same rate as a large order.
- Infrastructure surchargesOne rate covers everything we do.
Pricing
Two rates. Both all in.
Plus a one time $30 installation fee per machine. Shipping and import duty are included in the miner price.
$0.07per kWh
No minimum. As few as one machine.
The same rate for a single miner as for a large order. The rate is fixed for the length of your contract.
$0.08per kWh
Minimum 10 units per order.
Machines bought anywhere, Whatsminer or Antminer, racked and run the same way in the same facility.
Your bill
Estimate it in ten seconds.
Monthly electricity, what is due at signup, and the one time setup. Electricity only: mining revenue depends on BTC price and difficulty. To model revenue, use the bitcoin mining profitability calculator.
Bring your own orders start at 10 units. Machines bought from us have no minimum.
Based on rated power running 24 hours a day for 30 days. The deposit is refundable. Billing is in USD or USDT.
Terms
Plain terms.
Hardware insurance is not included. Repairs are the owner's responsibility; we monitor on site, tell you about issues and help coordinate warranty claims or replacement parts. We do not guarantee any financial return.

Where it runs
Southeast Texas, on Entergy Texas.
Our only location today: 6 MW, air and hydro capable, served by a regulated utility rather than a spot market. Tours are available for clients hosting more than 15 units.
Hosting FAQ
Answered plainly.
A deposit equal to two months of estimated electricity, based on your miner's rated power, plus the one time $30 installation fee per machine.
Yes. Bring your own fleets are hosted at $0.08 per kWh with a minimum of 10 units per order. Machines bought from us are hosted at $0.07 per kWh with no minimum.
Yes. We host air and hydro cooled machines, including the Whatsminer M70, M70S and M73 and other compatible units.
On site security staff 20 hours a day, 7 days a week, with 24 hour camera surveillance.
Typically 1 to 14 days after your miners arrive, depending on scheduling and the number of units.
No. Returns depend on bitcoin's price, network difficulty and miner efficiency. We provide the infrastructure at $0.07 per kWh all in; we cannot and do not guarantee any financial return.
Tours are available for clients hosting more than 15 units, with a confidentiality agreement not to publicize the site's location. Email info@fathomlabsllc.com to arrange a visit.
Ready when you are
Send us your fleet size and model.
We reply within one business day with specs, onboarding steps and current availability.